1 SCHEMATIC DIAGRAM 2 2 WIRING CONNECTION DIAGRAM 2 3 DISASSEMBLY/ASSEMBLY INSTRUCTIONS 3 4 TROUBLESHOOTING GUIDE 6© 2002 Matsushita Electric Works
7 REPLACEMENT PARTS LISTNOTE:*B=only available as set*C=available individuallyRef.No. Part No. Part Name & Description Remarks Per Unit1 WEY6813K3
1 SCHEMATIC DIAGRAM2 WIRING CONNECTION DIAGRAM2EY6813-U1
HOW TO DISASSEMBLE THE MAIN UNIT.3 DISASSEMBLY/ASSEMBLY INSTRUCTIONSRef. No. 1A Procedure 1A Removal of the housing.1. Set the hammering/drilling swi
HOW TO DISASSEMBLE MAIN UNIT.Ref. No. 2A Procedure 1A→→→→1B→→→→2A Removal of the switch.1. Take out the heat sink from the housing by something like
HOW TO DISASSEMBLE THE GEAR BOX BLOCK.Ref. No. 2C Procedure 2A →→→→ 2B →→→→ 2C Removal of the gear box block.1. Loosen 8 screws of the gear case.2. T
(Refer to WIRING CONNECTION DIAGRAM)4 TROUBLESHOOTING GUIDE4.1. CHECK POINTS FOR ELECTRICAL PARTS.< TROUBLE > < CHECK > < REMEDY >Do
4.2. CHECK POINTS FOR MECHANISM BLOCK.< TROUBLE > < CHECK > < REMEDY >Does not hammer <CHECK INTERMEDIATE SHAFT ASSEMBLY.> NO
5 TRIAL OPERATION(after checking TROUBLESHOOTINGGUIDE.)5.1. HAMMER/DRILLConfirm the action when setting the H/D handle to HAMMER mode.Rotation with ha
6 EXPLODED VIEW9EY6813-U1
Commentaires sur ces manuels